Develi Mayor
The facility, which has a 2,000 m² indoor area built on a 19,000 m² treasury-allocated land, was constructed at a cost of 1 million TL (600,000 TL was received as a grant from the Ministry of Environment and Urbanization) and has commenced operations.
A total of 60,000 tons of hot asphalt was used to repair roads damaged by natural gas and infrastructure works.
The foundation has been laid for the new Develi State Hospital, which will have a capacity of 150 beds and an estimated cost of approximately 52 million Turkish Lira. It is planned to be completed within 600 working days.
The accessible living center is planned to be built on an area of 12,671 m² in plot 1 of block 1352.
Construction of a 999 kW solar power plant on a 20,000 m² area is underway in the Bozburun district of Reşadiye neighborhood.
Construction is planned on an area of 208,000 m² in the Abdulbaki and İzmirli neighborhoods.
The renovation of the vegetable and fruit market, which operates on Tuesdays, has been completed in its current location, covering 10,000 m² of indoor and 4,600 m² of outdoor space, and is now open to the public.
The second phase of TOKİ housing units is nearing completion and will be delivered as soon as possible.
Kayseri University's Seyrani Campus, located in our district, currently operates with four educational blocks.