Square Renovation Project

About Project

The existing pools have been simplified.was simplified.

The floor and seating wallsweremade of basalt.wasmade. (775 m²)

An additional area was added to the children's playgroundand wooden play groups were installed.

Rubber material was laid on the children's areaground.

40 wooden tapes, 30 wooden trash cans, 15 tables, and seating sets were placed, and the toilets were maintained. !supportLists]-->• Renovation of pools and tankswasmade.wasmade.

The bottoms of treesare filled with special composite ızridge was placedştirt, supported by lighting.

16 Signs were placed on monuments symbolizing the Great State, lighting and fountains were installed.ştirildi.