About Project
• With the new law, the drilling pumps and pipes of the villages that were transformed into 14 neighborhoods were converted to steel lines.
• In 2014, 54,000 meters of pipeline were laid in the Öksüt Gıcık Drinking Water Project. Its cost was 20 million TL.
• In 2014, 7,000 meters of pipeline were laid for Develi and its surrounding areas.
Cost: 2.5 million TL
• In 2015, the internal and external insulation and booster pumps of 12 storage tanks in an area of 7,500 meters were replaced. Cost: 3.5 million TL
• In 2016, asbestos pipes in an area of 9,000 meters were replaced with new ductile pipes. Valves were renewed and a satellite system was implemented. Cost: 5 million TL. Work was carried out in a total area of 77,500 meters, including Develi district center and newly connected neighborhoods. Cost: 31 million TL